Profitability analysis in the design stage between a two-dimensional CAD model and a BIM model for the Road Interchange project, Km 25+115.85 of the Juliaca - Puno Highway

Authors

DOI:

https://doi.org/10.53673/th.v2i1.90

Keywords:

BIM, CAD, rentabilidad, intercambio vial, planchas de acero corrugado galvanizado Multiplate MP152, herramientas de software

Abstract

The objective of this article is to study the profitability produced by the application of Building Information Modeling (BIM) technology, in the file design stage, compared to the traditional calculation method that is based on two-dimensional (2D) drawings. . The case study is the structure made up of galvanized corrugated steel plates (Multiplate MP152), reinforced concrete foundations and walls, structural filling and flexible pavement, of the Road Interchange project, Km 25+115.85 of the Juliaca - Puno Highway. The methodology for the development of the BIM model is presented taking into account five variables (dimension in the x axis, dimension in the y axis, dimension in the z axis, time and cost), with the integration of information using tools such as Autodesk software. : Recap, Civil 3D, Revit, Infrawork and Navisworks. A comparison is made of the Design of the most important items, obtained with the traditional method and with the use of BIM, from which it is possible to verify the contribution and/or profitability produced by the implementation of BIM in the design of these items. . As a result of the modeling in BIM, a saving of 24% is valued in terms of execution time and based on profitability, it is estimated that said saving with BIM is 43.81% in relation to CAD, concluding that BIM technology is simpler and efficient to manage, streamlining all design processes.

References

ASIDEK. (12 de diciembre de 2016). La situación del BIM en el mundo evoluciona. ASIDEK. https://www.asidek.es/la-situacion-del-bim-mundo

BIM Forum Chile (2017). Guía inicial para implementar BIM en las organizaciones. Corporación de Desarrollo Tecnológico - Cámara Chilena de la Construcción. https://www.bimforum.cl/wp-content/uploads/2017/07/Gu%c3%ada-inicial-para-implementar-BIM-en-las-organizaciones-versi%c3%b3n-imprenta.pdf

Borja, S. A. (18 de noviembre de 2015). Qué es Revit o mejor, qué es BIM. Espacio BIM. https://www.espaciobim.com/que-es-revit/

Chavarría, E. (2018). La metodología BIM para optimizar el diseño de la carretera Luricocha-Pacchancca, Ayacucho 2018. Universidad César Vallejo. https://repositorio.ucv.edu.pe/handle/20.500.12692/22807

Contreras, J., Garzón, Y., Gómez, A. & Misie, R. (2018). Integración entre building information modeling y project management institute como propuesta metodológica para la gestión de proyectos. Ingeniería, vol. 22, núm. 3, pp. 1-16. https://www.redalyc.org/journal/467/46759491001/html/

Enshassi, A., & AbuHamra, L. (2016). Investigación de las funciones del modelado de la información de construcción en la industria de la construcción en Palestina. Revista Ingenieria de Construccion, 31(2), 127–138. https://doi.org/10.4067/S0718-50732016000200006

EquipoPVP. (17 de agosto de 2018). ProgramasvirtualesPC. Obtenido de https://www.programasvirtualespc.net/software/autocad-civil-3d-2019-0-1-espanole-ingles-construccion-y-diseno-en-ingenieria-civil/es.BIM

Fernando. (12 de 04 de 2017). Autodesk Latam. Obtenido de http://blogs.autodesk.com/latam/2017/04/12/autodesk-infraworks-colaboracion-yvisualizacion-a-la-vanguardia/

García, B. (2017). Efecto de la Fibra de Vidrio en las propiedades mecánicas del Concreto F’C=210 kg/cm2 en la ciudad de puno. Universidad Nacional del Altiplano. 2017 https://repositorio.unc.edu.pe/bitstream/handle/UNC/656/T%20690%20P739%202014.pdf?sequence=1&isAllowed=y

Huancas, E. & Torres, H. (2020). METODOLOGÍA BIM PARA CICLOS DE DESARROLLO DE PROYECTOS INMOBILIARIOS, LAMBAYEQUE. 2018. Universidad Señor de Sipán. Pimentel, Perú. https://repositorio.uss.edu.pe/bitstream/handle/20.500.12802/6997/Huancas%20Tineo%20Edwin%20%26%20Torres%20Pedraza%20Heggel.pdf?sequence=1&isAllowed=y

Ministerio de Transportes y Comunicaciones (2016). Informe de Modificación de Ingeniería de la Variante de Paucarcolla correspondiente a la Construcción de la Autopista Puno – Juliaca. MTC; Covisur.

Karlshøj, J. (2012). Not just CAD ++. BIM Journal, 3(28), 39–42.

Medina, P. & Salomón, N. (2019). Evaluación de la estimación de metrados para los costos de la partida de arquitectura de una obra retail en Lima en el 2019 con la implementación BIM. Universidad Tecnológica del Perú. Lima, Perú. https://repositorio.utp.edu.pe/bitstream/handle/20.500.12867/3435/Pablo%20Medina_Nataly%20Salomon_Trabajo%20de%20Investigacion_Bachiller_2019.pdf?sequence=1&isAllowed=y

Noor, B. A., & Yi, S. (2017). Building Information Modeling in Construction Phase. International Journal of Engineering and Innovative Technology (IJEIT), 33(10), 36–44. https://doi.org/10.17605/OSF.IO/TB6U9

Monfort, C. (2015) Impacto del BIIM en la gestión del proyecto y la obra de arquitectura. Universidad politécnica de Valencia. Escola Técnica de Arquitectura. https://docplayer.es/8512882-Impacto-del-bim-en-la-gestion-del-proyecto-y-la-obra-de-arquitectura-un-proyecto-con-revit.html

Ramírez, J. (2018). Comparación entre metodologías building information modeling (BIM) y metodologías tradicionales en el cálculo de cantidades de obra y elaboración de presupuestos. Caso de estudio: edificación educativa en Colombia. Universidad Distrital Francisco José de Caldas. Bogotá, Colombia.

Ureña, V. (20 de junio de 2020). Infrastructure Technical Specialist en Autodesk [Discurso principal]. Conferencia de las Naciones Unidas, Autodesk Spain & Portugal.

Published

2021-09-03

How to Cite

Sergio Llanos Díaz, Sujei Ñaupa Mamani, Samuel Marca Arocutipa, & Correspondencia: Rubén Fitzgerald Sosa Aquise. (2021). Profitability analysis in the design stage between a two-dimensional CAD model and a BIM model for the Road Interchange project, Km 25+115.85 of the Juliaca - Puno Highway. Tecnohumanismo, 1(3), 101–119. https://doi.org/10.53673/th.v2i1.90